Layout:
Home > week 2

week 2

April 13th, 2013 at 11:39 pm

Of kitchen remodel.

Basically it was at the bottoming out stage - they couldn't rip out any more ... drywall covering the plumbing was ripped out, and the drywall at chest level was ripped out so the electrician could install under cabinet lighting.



The gypcrete floor above the subfloor and underneath the vinyl had to be replaced, it was worn into pebbles in the work triangle between sink, stove, and refrigerator. That, and the plumbing had to be shifted a little bit were the only 'surprises' thus far.



The stove is gone - it is going to its second career as the stove of one of the contractors. He told me later that the stove was working like a champ.

Week 3 next.

0 Responses to “week 2”

Leave a Reply

(Note: If you were logged in, we could automatically fill in these fields for you.)
*
Will not be published.
   

* Please spell out the number 4.  [ Why? ]

vB Code: You can use these tags: [b] [i] [u] [url] [email]