Monday the new floor was set up and the drywall was replaced. It was all sealed off, so that was my carryout day. I've been doing okay with the bag of salad with a vinegar/oil dressing, both ingredients that I could store in my little bedroom kitchen.

Tuesday it looked like I could paint, so I did, but it turned out the texture guy had to do his work, so I had to paint again Wednesday. Back of my living room had a wall of boxes full of cabinet:



FYI - V.I. is holding up. While work is going on, she's behind my bedroom door w/full access to bedroom w/food dish, bonus room, cat box in the master bathroom. So far, no sign of cat displeasure on a bed pillow.

Smooth painted box stage. I wanted to paint now because I figured it would be a billion times harder after the cabinets were installed. The white squiggles are where the under cabinet lighting's going to go.



Finished the week on a high note. Lower cabinets are going in. I have tried all the drawers and pull outs. All soft close. I have made a resolution to mentally take $1 worth of enjoyment watching the soft close work. I figure at 5x/day, $1600/yr. I expect the remodel is going to be 30K. I'm not going to totally recoup it, but I'm going to make a big dent.

0 Responses to “week 3”

Leave a Reply

(Note: If you were logged in, we could automatically fill in these fields for you.)
*
Will not be published.
   

* Please spell out the number 4.  [ Why? ]

vB Code: You can use these tags: [b] [i] [u] [url] [email]